Hunter Finneran is the electrical engineer responsible for the wind turbine generators (WTGs) as well as the electrical system studies and modeling. Prior to joining Vineyard Offshore, Hunter spent 6 years as a power system engineer designing, testing, and commissioning equipment on nuclear submarines for Electric Boat, as well as power electronics and energy storage R&D at Raytheon. Hunter is based out of New London, Connecticut and holds a degree in Electrical and Computer Engineering from the University of Connecticut.